Tank & Piping Inspections

At ATS our engineering services for tank inspections and integrity programs provides companies and industries the confidence to minimize unscheduled downtime, safety and environmental risks and at the same time maximize the benefits of their inspection dollars. Our engineers are experienced, hands-on field and office professionals implementing comprehensive testing and inspections in an efficient and cost effective manner positioning us above our competition.

tank inspections

API 653 Tank Inspection

  • Mechanical Integrity
  • Qualitative RBI
  • NACE Coating Inspections
  • Compress, Algor, Cosmos
pressure vessel inspections

API 510 Pressure Vessel Inspection

  • ASME, OSHA
  • TAPPI, NACE, STI
  • API RP579 Techniques
  • NDE Methods
piping inspections

API 570 Piping Inspections

  • Fitness For Service
  • Risk Based Inspections
  • Spill Prevention Control
  • NDT Inspections
boiler inspections

Boiler Inspections

  • ASME Section VIII, Division 1
  • ASME Section VIII, Division 2
  • Deaerator Tanks
  • Heat Exchangers
  • Glass Lined Vessels
boiler inspections

Industrial Boiler Services

  • Recovery
  • Bark
  • Coal
  • Gas & Alternative Fuel
  • Biomass
boiler tube failure analysis

Boiler Tube Failure Analysis

  • Caustic Corrosion
  • Short-term Overheat
  • Deposit Weight Density
  • Chemical Composition
  • Pit Depth Measuring
heat exchanger failure analysis

Heat Exchanger Failure Analysis

  • Corrosion
  • Improper Material Selection
  • Obstructions
  • Thermal Fatigue
  • Vibration Fatigue
heat exchanger failure analysis

Above Ground Storage Tank

  • Mechanical Integrity
  • Ulrasonic B-scans and C-scans
  • Magnetic Flux Leakage
  • Ultrasonic Thickness
  • Remote Access Ultrsonic Crawlers
heat exchanger failure analysis

NFPA 25 Fire WaterTank Inspection

  • In-service Fire Water Tank
  • Out-service Fire Water Tank
  • 5-Year Inspections
  • 3-Year Inspections
  • Interior/Exterior Inspections
heat exchanger failure analysis

NFPA 25 Inspection Requirement

  • Per 6.2.6.1.2 - 5 Year
  • Per 6.2.6.1.1 - 3 Year
  • Per 9.2.5.1 - Quarterly
  • 9.2.6 - Required Tests
  • Interior/Exterior
heat exchanger failure analysis

ROV Tank Inspections

  • In-service Inspections
  • NDT Visual Inspections
  • Cost Effective
  • Eliminates Need for Diver
  • NFPA
heat exchanger failure analysis

In Service Inspections

  • More Time Efficient
  • Cost Effective
  • Firewater Tanks
  • ROV Inspections
  • Safe and Effective